The existing golf green at Tee Time Golf Centre, before work began on site
Leisure and Sport

Tee Time Golf Centre, Fleetwood Road, Blackpool

A 12-hole adventure golf course celebrating Blackpool's heritage, added to a sporting site that has served the town since 1968.
The existing golf green at Tee Time Golf Centre, before work began on site

The Project

Tee Time Golf Centre has been part of Blackpool's sporting life since 1968, and its owners wanted to add something new to the site: a 12-hole adventure golf course celebrating the town's heritage. Cohanim Architecture led the project from first concept through to consent, turning an unused pocket of backfilled land within the existing centre into a family attraction where every hole tells a local story, from the Tower and Ballroom to the Illuminations, the seafront tram and Blackpool rock. We prepared the masterplan, the Planning Statement and Design and Access Statement, and a landscape scheme of native planting, rain gardens, new trees and a perimeter hedgerow that softens the course against neighbouring homes and delivers a measurable biodiversity net gain. Backed by more than a dozen letters of support from councillors, sporting bodies and neighbours, the application went to Blackpool Council in December 2024 and, after a year of objections and consultee queries, was approved by the planning committee in July 2025.

Discharging the conditions

Securing planning permission was only part of the job. The consent came with conditions covering surfacing materials, the height and design of each hole feature, surface water drainage and its long-term maintenance, land contamination and biodiversity net gain. We coordinated the drainage, biodiversity and geo-environmental consultants, produced the hole design and surfacing packages in-house, and managed the discharge applications through to approval in February 2026, with the final land contamination condition discharged in March 2026 following a Phase 2 site investigation. With every condition cleared, work began on site in spring 2026, bringing an affordable, educational new attraction to a much-loved community facility.

Add a client or consultant quote for this project.
— Name, Role
Location
Fleetwood Road, Blackpool
Sector
Leisure and Sport
Services
Masterplanning, Planning Statement, Design and Access Statement, landscape design, discharge of planning conditions
Status
Under construction
This is some text inside of a div block.
This is some text inside of a div block.
Newsletter

Stay in touch - receive updates on important case law changes that may impact your site, project news and case studies to help you.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Henley-on-Thames
Old Brewery House, 86 New Street
Henley-on-Thames RG9 2BT
London
207 Regent Street, 3rd Floor
London W1B 3HH