Cohanim ArchitectureCohanim Architecture
Case study · Blackpool

Tee Time Golf Centre

A 12-hole adventure golf course celebrating Blackpool's heritage, added to a sporting site that has served the town since 1968.
Project
Tee Time Golf Centre, Fleetwood Road, Blackpool — a 12-hole adventure golf course
Location
Fleetwood Road, Blackpool
Client
Tee Time Golf Centre (private ownership)
Service
Masterplanning, Planning Statement, Design and Access Statement, landscape design, discharge of planning conditions
Key work
12-hole heritage-themed adventure golf course; native planting, rain gardens, new trees and a perimeter hedgerow; biodiversity net gain
Date
December 2024 – ongoing

Tee Time Golf Centre has been part of Blackpool's sporting life since 1968, and its owners wanted to add something new to the site: a 12-hole adventure golf course celebrating the town's heritage. Cohanim Architecture led the project from first concept through to consent, turning an unused pocket of backfilled land within the existing centre into a family attraction where every hole tells a local story, from the Tower and Ballroom to the Illuminations, the seafront tram and Blackpool rock. We prepared the masterplan, the Planning Statement and Design and Access Statement, and a landscape scheme of native planting, rain gardens, new trees and a perimeter hedgerow that softens the course against neighbouring homes and delivers a measurable biodiversity net gain. Backed by more than a dozen letters of support from councillors, sporting bodies and neighbours, the application went to Blackpool Council in December 2024 and, after a year of objections and consultee queries, was approved by the planning committee in July 2025.

The conditions

Securing planning permission was only part of the job. The consent came with conditions covering surfacing materials, the height and design of each hole feature, surface water drainage and its long-term maintenance, land contamination and biodiversity net gain.

Discharge and delivery

We coordinated the drainage, biodiversity and geo-environmental consultants, produced the hole design and surfacing packages in-house, and managed the discharge applications through to approval in February 2026, with the final land contamination condition discharged in March 2026 following a Phase 2 site investigation. With every condition cleared, work began on site in spring 2026, bringing an affordable, educational new attraction to a much-loved community facility.

Site and existing building

The site, as found

The existing golf green at Tee Time Golf Centre, Fleetwood Road, Blackpool, before work began on site
The existing golf green, before work began on site
Groundworks underway on site at Tee Time Golf Centre, May 2026
Groundworks underway on site, May 2026
Levelling and turf strip in progress on site at Tee Time Golf Centre
Levelling and turf strip in progress
Excavation plant on site during the groundworks at Tee Time Golf Centre
Excavation plant on site during the groundworks
Detail and coordination

The hole concept and the site plan

The hole concept proposal and the site plan submitted with the application, showing how the 12-hole course was laid out across the site.

Hole concept proposal drawing for Tee Time Golf Centre
Hole concept proposal
Proposed site plan for Tee Time Golf Centre, Fleetwood Road, Blackpool
Proposed site plan