Set within one of Bath's finest listed Georgian crescents, this project is the sensitive renovation of a maisonette occupying the upper floors of 1 Cavendish Crescent. The brief was to rework a home altered piecemeal over the late twentieth century - restoring the generosity of the original rooms while introducing the comfort and finish expected of a contemporary residence.
We began with a full measured survey and a detailed record of the existing building, then tested a series of layout options with our client before settling on a scheme that opens up the living spaces, reinstates the proportions of rooms subdivided without consent decades earlier, and adds a new en-suite in place of an ill-fitting later kitchen addition.
Because the building is listed, every intervention had to be justified and carefully drawn. We prepared a Listed Building Consent application for Bath and North East Somerset Council covering the removal of later kitchen fittings and partitions, new timber joinery, the exposure and reinstatement of the original timber floorboards, and a like-for-like replacement of the external extract louvre, supported by existing, demolition, proposed and plumbing drawings. The application was submitted in April 2026, with revised drawing issues in June and August responding to the council's feedback; a decision is awaited.




An original room, with its fireplace and joinery as found

The dining room, opening through to the sitting room

One of the existing bedrooms

The existing study
What the early stages established: the brief, the survey, the constraints, and any information model set up at this point. Two or three sentences. Replace with final copy.
The design idea and how it got permission. Name the application references and any appeal outcome here rather than in a caption. Replace with final copy.
What the model or the coordination process resolved, and who used it. Replace with final copy.
What the technical package resolved: structure, thresholds, weathering, services, making good, and the interface with existing fabric. Replace with final copy.
How the works were phased and what the design team did on site. If the building stayed in use, say so here. Replace with final copy.
What was delivered and what the client was left with. Duplicate or delete cards to match the stages this project actually covered. Replace with final copy.
Every project has one decision that carried the rest: an access strategy, a structural move, a planning argument. Give it a paragraph and six drawings. If the project does not have one, delete this whole section rather than padding it. Replace with final copy.
A short paragraph tying the two large drawings together. Usually one elevation and one plan. Replace with final copy.